Gason
Stage 1 & 2

Gason two-stage facility boosts manufacturing efficiency, enhances safety, and supports growth with streamlined storage and workflow solutions.


Ararat, Victoria


July 2024


Industrial, Distribution & Logistics


AUD$3.3m


Complete


A.F. Gasons Pty Ltd

Project Overview

MKM Building Group was engaged by Gason, a leading Australian agricultural machinery manufacturer, to deliver a purpose-built facility to support their expansion. The project objective was to increase manufacturing capacity, integrate a mechanised storage system, and improve operational efficiency through a tailored building design.

The facility was designed to align with Gason machinery requirements and streamlined production methods. Layout planning focused on maximising usable space, improving workflow, and supporting long-term scalability.

Project Success & Impact

With both stages now complete, Gason’s operations have benefited from a fully integrated facility. The mechanised storage system has streamlined materials handling, enhanced organisation, and maximised floor space. The upgraded layout has created a safer and more efficient environment for employees by reducing congestion and improving productivity.

Delivering the project in two separate stages ensured continuous production throughout construction and gave Gason the flexibility to refine workflows between phases. The completed facility is designed to meet current operational needs and accommodate future growth, positioning Gason to confidently meet increasing demand within the agricultural manufacturing sector.